The Educational Opportunity Center (EOC), is the University at Buffalo's facility for training urban community members for jobs and preparing them for higher education.
The EOC with the Downtown Gateway building (former M. Wile building), will form UB's Downtown Gateway Complex, a cornerstone of UB's downtown campus and a resource that will expand university access for people in the community, regardless of income and education.
The new EOC building will replace its current location at 465 Washington St. and allow the EOC to significantly expand its services, which include programming in remedial and academic preparation, as well as specific job training programs in allied health, life sciences, information technology and environmental industries. More than 2,000 people take part in UB's EOC services annually.
Savarino Co. has been awarded the contract to build the 68,000 s/f facility. The adjacent M. Wile building will be renovated and connected to the new building by a 4,900 s/f glass atrium. Cannon Design is the construction manager.
Designed by Holt Architects of Ithaca under the oversight of the State University Construction Fund, the new EOC building will be constructed of environmentally friendly, durable fiber cement panels and glass. The design will feature large window frames and open stairways that bring natural light into the building, and offer faculty, staff and students dynamic views of the city.
The first floor of the EOC has a conference center, enrollment management suite, career services suite and support spaces, in addition to a Head Start program, which will have an independent entrance and an enclosed outdoor playground.
Classrooms, faculty and administrative offices, a computer lab, library, "information commons" and student and faculty lounges will be located on the top three floors.
The Educational Opportunity Center operates in an urban area. In an era where schools and universities are experiencing a higher level of violence, the architect and University of Buffalo turned to Business Protection Specialists to conduct a design concept risk assessment and determine the security needs of the facility. BPS incorporated those requirements into the overall building and site plans by developing security system specifications and drawings. EOC students and staff will enjoy a safer workplace as a result of security being incorporated into the planning at the earliest stages of design.
The building will be LEED certified in keeping with the goals of the UB 2020 strategic plan's focus on making the university's three campuses great places to live, work and learn, in part by improving their environmental sustainability.
Thanks for Reading!
You've read 1 of your 3 guest articles
Register and get instant unlimited access to all of our articles online.
Sign up is quick, easy, & FREE.
Subscription Options
Sign up is quick, easy, & FREE.
Already have an account? Login here