The CIB Awards jury selected the project for superior work, which exemplifies quality concrete. The jury stated: "The design and construction of the building incorporated some of the most recent innovations in concrete technology, including voided slabs, post-tensioned and self-consolidating concrete."
The project consists of a 15-story concrete tower above grade with one basement level. The building is a unique sequence of cascading concrete floors interconnected by stairs and ramps, creating a vertical campus within the building. To accomplish the designs long cantilevers, the floors are formed of bonded post-tensioned concrete slabs. A slab void former system, called Cobiax, is used to reduce the self weight of the slabs.
Thanks for Reading!
You've read 1 of your 3 guest articles
Register and get instant unlimited access to all of our articles online.
Sign up is quick, easy, & FREE.
Subscription Options
Sign up is quick, easy, & FREE.
Already have an account? Login here