News: Spotlight Content

Improving design quality and total project delivery with Building Information Modeling

An accepted definition of Building Information Modeling (BIM) actually refers to BIM as a "process involving the generation and management of a digital representation of physical and functional characteristics of a facility. The resulting building information model becomes a shared knowledge resource to support decision-making about a facility from earliest conceptual stages, through design and construction, then through its operational life before its eventual demolition." BIM is really a digital, three-dimensional model linked to a database of project information, in other words, a software tool. But this powerful tool provides the platform for collaboration throughout a building's design, construction and future facility management. The collaboration takes place among all design consultants from the beginning of a project so every aspect of the design can be coordinated whether it is architectural, structural, engineering, etc. Because the model is linked to a database, any change to one design is reflected throughout the model; thus, eliminating oversights and saving time changing design models and drawings. BIM can be employed on projects of any size and portions of projects. Large complex projects can involve many interconnected models. The 3-D depictions aid the owner and the entire team in visualizing the project which makes design decisions easier. It is easier to do complex design in BIM because you can document the complexity better in the drawings. Errors/clashes in design among the disciplines can de spotted and resolved easily. BIM can also be used to track LEED points. It will allow you to set up an attribute in a model; you can have models for daylighting and energy studies and also track LEED status during the design process in real time. Moving beyond design, BIM models can facilitate materials purchasing, the bidding process, and the construction stage of the project. Fabricator models can interact with a design model to provide information for purchasing. Linking the contractor's model to the design model can allow you to actually pre-build the project before actual construction and provide information for better staging and scheduling. JFK&M understands the significance of quality design and completing a project efficiently. Therefore, we employ the use of BIM to manage the coordination of MEP/architectural design. JFK&M has used BIM on a number of different types of renovation and new construction projects. We provided New York University with comprehensive MEP/FP/IT engineering design services for the expansion of the administrative offices of three university departments, Stern School of Business, NYU Regional Campuses for international locations, and the History Department, located in the historic Silk Building. JFK&M used the BIM model to coordinate the new pipe and ductwork distribution with the large quantity of the existing mechanical, electrical and plumbing in the ceiling of this 1908 Italian-Renaissance-palazzo style building. This model illustrates the NYU Abu Dhabi regional office space. The height restrictions and the existing piping in the 1908 building required us to use a dedicated air system for ventilation and vertical floor mounted fan coil units for cooling and heating. The model depicts the ceiling ductwork, air distribution system, existing steam lines, light fixtures, fan coil units, and the chilled water piping serving the fan coils. Other projects where JFK&M is utilizing BIM include two healthcare clients and one major university client. One project is the new construction of a 176,000 s/f Ambulatory Surgery Building for a major healthcare institution; the second is a much smaller project, the renovation of a laboratory in the Advanced Imaging Facility at CUNY College of Staten Island and the third example is a major MEP upgrade in The Field Building, CUNY Baruch College. These examples clearly show the level of detail of the models and it is easy to understand how BIM models improve the design quality and the delivery of the entire project. Andrew Kozak is a mechanical department director, JFK&M Consulting Group LLC, New York, N.Y.
MORE FROM Spotlight Content

2026 Developing Queens: The Sutphin Hillside Towers at Jamaica Station

Queens, NY Asset CRG Advisors brokered one of the largest Opportunity Zone development sales in the country — a transformative site in the heart of downtown Jamaica. Managing partners Yuriy Ustoyev and Sadya Liberow represented both buyer and seller in the $59.7 million transaction
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
From vacancy to vitality: How adaptive reuse is reshaping Long Island’s CRE landscape - by Andrea Tsoukalas Curto

From vacancy to vitality: How adaptive reuse is reshaping Long Island’s CRE landscape - by Andrea Tsoukalas Curto

Adaptive reuse has become one of the most important conversations in commercial real estate today. Long Island has a large inventory of aging retail, office and industrial
2026 Developing Queens: Long Island Board of Realtors  advances commercial growth and advocacy in Queens

2026 Developing Queens: Long Island Board of Realtors advances commercial growth and advocacy in Queens

The Long Island Board of Realtors (LIBOR) Commercial Network continues to play a key role in advancing opportunities and strengthening the commercial real estate landscape across Queens. Through targeted programming and global outreach
Properly serving a lien law Section 59 Demand - by Bret McCabe

Properly serving a lien law Section 59 Demand - by Bret McCabe

Many attorneys operating within the construction space are familiar with the provisions of New York Lien Law, which allow for the discharge of a Mechanic’s Lien in the event the lienor does not commence an action to enforce following the service of a “Section 59 Demand”.
CRE Guide Featured Company: Merritt Environmental Consulting Corp.

CRE Guide Featured Company: Merritt Environmental Consulting Corp.

Merritt Environmental Consulting Corp. (MECC) was established in June of 2009 after being part of a larger engineering firm for almost 20 years. The focus of the company is to assist lending institutions, attorneys, real estate investors, and property owners with environmental concerns. Today, MECC has offices in New York, Florida, and Vermont and has grown into a regional consulting firm serving clients along the East Coast.