These systems will provide power for the Central Energy Plant as well as the Jerome Greene Science Center (also known as the Mind Brain Building), which is being constructed adjacent to the plant. E-J and Egg Electric will also supply the remaining distribution equipment within the plant, as well as the core and shell lighting, power and connection of mechanical equipment.
The project, scheduled to take place from this January through June 2015, will be led by project executive Alan Doubert, major projects senior vice president Frank Lambraia, as well as project manager Enna Sharma of Egg Electric.
For more information about E-J Electric, please visit: www.ej1899.com.
About E-J Electric Installation Co.
E-J Electric Installation Co. is active in all facets of electrical contracting. Projects vary in size to over $100 million. Typical installations include: office buildings, hospitals, power plants, co-generation facilities, data communication centers, airline computer systems (120 cities in the United States), industrial plants, universities, movie studios, sport stadiums, transit facilities, roadway installations and high voltage distribution. At E-J Electric Installation Co., three family generations of practical expertise have created an organization keyed to the most modern technological advances in providing rapid and efficient solutions to today's lighting, power, energy and communication needs. E-J has a 114-year reputation for unparalleled integrity, quality and service in the electrical field. Please visit their website at www.ej1899.com to learn more about the company.
Thanks for Reading!
You've read 1 of your 3 guest articles
Register and get instant unlimited access to all of our articles online.
Sign up is quick, easy, & FREE.
Subscription Options
Sign up is quick, easy, & FREE.
Already have an account? Login here