LERA'S Columbia University Medical Center Project wins Annual Award from The Concrete Industry Board
The Concrete Industry Board of New York selected the Columbia University Medical Center, Medical and Graduate Education Building for the top honor of the year, The Annual Award at the 53th Annual Roger H. Corbetta Awards dinner held at the Marina del Rey in the Bronx on November 12, 2014. The project team includes architecture firms, Gensler and Diller Scofidio + Renfro and structural engineer, Leslie E. Robertson Associates (LERA). Sciame Construction is the Construction Manager and General Contractor for the project. The new Medical and Graduate Education Building will provide modern classroom spaces, immersive simulation and advanced training facilities for the 21st century.
The CIB Awards jury selected the project for superior work, which exemplifies quality concrete. The jury stated: "The design and construction of the building incorporated some of the most recent innovations in concrete technology, including voided slabs, post-tensioned and self-consolidating concrete."
The project consists of a 15-story concrete tower above grade with one basement level. The building is a unique sequence of cascading concrete floors interconnected by stairs and ramps, creating a vertical campus within the building. To accomplish the designs long cantilevers, the floors are formed of bonded post-tensioned concrete slabs. A slab void former system, called Cobiax, is used to reduce the self weight of the slabs.
What was the most rewarding project or deal you’ve worked on in the past 12 months, and why? I had the honor to assist The Arc of Rensselaer County to implement a strategic plan for consolidation of their program and administrative services.
Walk down any New York block this year and you can feel it. The sidewalks are crowded, the storefronts are lit, and the energy that defines this city is back at full volume.
Artificial intelligence (AI) is beginning to help transform lending by enhancing decision-making, improving risk management and streamlining operations. With AI-powered tools that analyze vast amounts of data, lenders are able to assess borrower creditworthiness more accurately and efficiently. AI can evaluate a wide range of factors,
You have a right to be concerned. I am always surprised at the companies that will negotiate the price of their new facility down to the last dollar, without thoroughly analyzing their
There was a time when an offering memorandum (OM) was pretty bare bones, some photos, a few bullet points on income, and a rent roll thrown in at the back. That used to get the job done. Not anymore. In 2025, buyers are sharper, faster, and more selective. They’re looking