Taking time and steps in the planning process makes for a successful architectural project by William Gati

William Gati, Architecture Studio William Gati, Architecture Studio

Here are steps for designing and building an architectural project:

1) Create a plan

After choosing a design firm, it’s time to start creating a plan. There are usually several good ways to reach your design goals.

 The plans are called schematic designs; they usually involve a rough layout of the floor plan and some simple views of the exterior of the home if there is an addition. It takes time for the design professional to work these out, and then usually another week or two for the homeowners to consider them and make decisions. If the project is larger or the homeowners want additional changes made to the schematics, this initial design phase can take several months.

 2) Interview contractors

Contractors are frequently brought into the process once a final schematic design has been selected. Usually there is at least a general idea of how the home will look from the outside, a dimensioned floor plan and some preliminary material selections. With this much information, it’s possible to provide preliminary estimates of cost.

Contractors are often asked to estimate the schematic design as part of the interview process. It may take a couple of weeks to set up the interviews and generally at least two to three weeks after interviews to receive the estimates. Altogether it could take four to six weeks to interview candidates and receive estimates. After that you may want to call references, visit jobsites or do additional research before making a decision about the contractor you will hire.

 3) Go shopping while others are engineering

Love to shop or hate to shop? This may determine whether you enlist a designer to help with your material selections. Even those who like to shop may be overwhelmed by all the options and want professional input. Do not underestimate the number of things that need to be selected, from doorknobs and windows to countertops and light fixtures. To really keep a handle on your project cost, it’s best to select every last thing ahead of construction. This will allow your contractor to tell you the prices for what you’d like and properly schedule material purchases based on lead times.

 Allow yourself one to two months to choose everything. While you are shopping for tile and hardwood floors, your architect or designer will finalize construction drawings, work with a structural engineer on how the project will be built and put in the details required for permitting. If it all goes well, you will work on this step and the previous one concurrently and finish at the same time.

 4) Get your permits

Depending on the scope of your project and where it’s located, permitting can take a day, months or even years. You should have some idea ahead of filing for permits about the length of the process, which will allow you to identify a likely start date for your project. Permit fees can range from a few hundred dollars to thousands of dollars, depending on where you live and how big your project is.

 5) Ready, set…

With the plan submitted for permits and material selections made, your contractor will be able to finish up pricing and write up a contract for construction. If the selected materials cost more than the budget allows, there may be a round of “value engineering,” which means changing scope of work or materials to reduce cost. By the time the contract is signed, your contractor will have identified the longer-lead items (like cabinets, windows, doors, tile and sometimes plumbing or electrical fixtures) and may even have them on order ahead of the start of construction, depending on the timing of your project.

By the time all of these steps are complete, it may be four to six months or even more since you started talking with design professionals.

The planning process can be lengthy, but each step you take will put you closer to starting your project with a clear vision of what’s to come. That investment of time on the front end means your entire construction team–design professional, contractor and you–can start the project on the same page with a clearly articulated plan. That makes it much easier say, “Go!” without any hesitation.

William Gati, AIA, is the president of Architecture Studio, Kew Gardens, N.Y.

MORE FROM Spotlight Content

Over half of Long Island towns vote to exceed the tax cap - Here’s how owners can respond - by Brad and Sean Cronin

When New York permanently adopted the 2% property tax cap more than a decade ago, many owners hoped it would finally end the relentless climb in tax bills. But in the last couple of years, that “cap” has started to look more like a speed bump. Property owners are seeing taxes increase even when an
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
Oldies but goodies:  The value of long-term ownership in rent-stabilized assets - by Shallini Mehra

Oldies but goodies: The value of long-term ownership in rent-stabilized assets - by Shallini Mehra

Active investors seeking rent-stabilized properties often gravitate toward buildings that have been held under long-term ownership — and for good reasons. These properties tend to be well-maintained, both physically and operationally, offering a level of stability
The strategy of co-op busting in commercial real estate - by Robert Khodadadian

The strategy of co-op busting in commercial real estate - by Robert Khodadadian

In New York City’s competitive real estate market, particularly in prime neighborhoods like Midtown Manhattan, investors are constantly seeking new ways to unlock property value. One such strategy — often overlooked but
How much power does the NYC mayor really have over real estate policy? - by Ron Cohen

How much power does the NYC mayor really have over real estate policy? - by Ron Cohen

The mayor of New York City holds significant influence over real estate policy — but not absolute legislative power. Here’s how it breaks down:

Formal Legislative Role

Limited direct lawmaking power: The NYC Council is the primary
Properly serving a lien law Section 59 Demand - by Bret McCabe

Properly serving a lien law Section 59 Demand - by Bret McCabe

Many attorneys operating within the construction space are familiar with the provisions of New York Lien Law, which allow for the discharge of a Mechanic’s Lien in the event the lienor does not commence an action to enforce following the service of a “Section 59 Demand”.