Manhattan, NY JRM Construction Management has completed All Saints located at 402 W 13th St. - spanning 1,900 s/f.
Collaborating closely with All Saints, JRM completed a comprehensive overhaul, including the installation of engineered wood flooring, Venetian Plaster wall finishes, low voltage shelves, and mirror lighting. A notable feature of the design is the Radius Wall, serving as a shoe display. The project also saw the creation of a cash wrap, enhancing the overall customer experience.
"We are thrilled to have successfully completed this project for All Saints" said Joseph Schimenti, director of retail at JRM Construction Management. "This achievement reflects our unwavering commitment to delivering exceptional results. The collaboration with All Saints and architect Shremshock has been instrumental in bringing this vision to life. We are grateful for the dedication of our team and look forward to continued success with All Saints."