Foit-Albert Associates to handle pre-design services for $8m project

May 22, 2009 - Spotlights

Rendering, City of Lockport mixed-use parking structure

Foit-Albert Associates, Architecture, Engineering, and Surveying, P.C. has recently been hired to handle pre-design services on the City of Lockport mixed-use parking structure. Services during this first phase of the project will set the stage for design and construction in phase II. Services in phase I include programming, surveying, collecting public input, providing assistance with grant and project funding opportunities, and calculating cost estimates.
This estimated $8 million project aims to improve and enhance the functionality of the property. The project will involve demolishing an existing, deficient parking structure and constructing a new, mixed-use structure that will open the lot up for tourism and parking.
Foit-Albert will design the architectural features of the structure including the facades and the Main St. level open space. Desman, a parking specialist firm, will provide consultation for the construction of the parking aspects of the project as well as provide structural engineering. TVGA will provide topographic survey and environmental engineering. KCI will provide mechanical, electric, plumbing, and fire protection engineering. Landscaping design will be handled by DWG Planning and Design.
Thanks for Reading!
You've read 1 of your 3 guest articles
Register and get instant unlimited access to all of our articles online.

Sign up is quick, easy, & FREE.
Subscription Options
Already have an account? Login here
Tags:

Comments

Add Comment